Avarra by Palace is an exceptional luxury project by Emaar in the heart of Business Bay, one of Dubai's most dynamic and prestigious neighbourhoods. The project combines the elegant design philosophy of the Palace hotels with modern high-rise architecture, creating a new icon on the city's skyline horizon.
The exclusive Palace-branded flats offer spacious layouts, high-quality materials and spectacular panoramic views of the Dubai Canal, the skyline of Business Bay and iconic landmarks such as the Burj Khalifa. Spacious balconies, floor-to-ceiling windows and luxurious interiors with marble and designer kitchens emphasise the aspirations of a premium urban lifestyle.
The residences are part of a state-of-the-art residential tower with a prestigious double-height lobby, luxurious communal areas and a variety of exclusive leisure facilities. Highlights include infinity pools with skyline views, outdoor fitness areas, private cabana lounges, BBQ terraces and extensive podium gardens.
Thanks to its prime location, Dubai's major destinations can be reached in just a few minutes. The Business Bay Metro Station is only about three minutes away, while Burj Khalifa and Dubai Mall can be reached in around nine minutes. Avarra by Palace thus offers a rare combination of luxury residence, central location and first-class investment potential.
Palace-branded luxury residences
Landmark Tower in the heart of Business Bay
Infinity pool with panoramic views
Double-Height Grand Lobby
Outdoor gym and wellness areas
Pool deck with cabanas and sun loungers
Kids Play Area and Kids Pool
BBQ terrace and outdoor dining areas
Exclusive retail space in the building
Breathtaking skyline and Burj Khalifa views
You can download the brochure and further information on the construction project here.
10 % Deposit on booking
10 % January 2026
5 % June 2026
5 % November 2026
10 % April 2027
5 % September 2027
10 % April 2028
5 % September 2028
10 % at 50 % Construction progress (March 2029)
10 % at 70 % Construction progress (September 2029)
10 % at 90 % Construction progress (April 2030)
10 % at handover (June 2031)
Free of charge and without obligation